east end both seem to use the name Maloney's Irish Pub nowadays. Maloney's Irish Pub, a bar with tables one the west end of the building, and Maloney's Restaurant on the. I used to be a member of an organization that occasionally met here for lunch so it has been about 10 years since I've been here. Barcelo Bavaro Palace All Inclusive Resort.Hotels near (AVP) Wilkes-Barre Intl Airport.SEQR Lead Agency: None Designated State Historic Preservation Act (SHPA) Determination:Ĭomments on this project must be submitted in writing to the Contact Person no later than Feb 04, 2021. Project is not subject to SEQR because it is a Type II action. Clean fill and top soil will also be placed in an 80' x 84' area behind the new wall section. Excavation will occur behind the wall to install deadman anchors and will be backfilled with clean material. 95' long and 1' higher than the existing wall. The new raised wall section spans approx. The project proposes the removal and replacement of an existing shoreline with a treated lumber wall secured with deadman anchors in the footprint of the existing wall. Contact:ħ-3552-00596/00001 Permit(s) Applied for:Īrticle 15 Title 5 Excavation & Fill in Navigable Waters Opportunity for Public Comment:Ĭomments on this project must be submitted in writing to the Contact Person no later than Feb 04, 2021. This project is not located in a Coastal Management area and is not subject to the Waterfront Revitalization and Coastal Resources Act. The application type is exempt and/or the project involves the continuation of an existing operational activity. The proposed activity is not subject to review in accordance with SHPA. Project is an Unlisted Action and will not have a significant impact on the environment. The current average daily water usage of the site is approximately 9,000 GPD with a max of 18,000 GPD. The report states the sprinklers run for approximately 20 minutes once to twice a day as needed. Water will be applied as needed to the track through a series of 150 sprinkler heads which each run at 3 gallons per minute. A well has been drilled which will be used to recharge the pond when necessary. The applicant's engineering report states water will be withdrawn from a manmade pond which collects surface water runoff. The applicant proposes a new water withdrawal to irrigate an existing motocross track in the Town of Granby. The Compound Mx LLC Motocross Track/Training Facilityħ-3528-00019/00006 Permit(s) Applied for:Īrticle 15 Title 15 Water Withdrawal Non-public Opportunity for Public Comment:Ĭomments on this project must be submitted in writing to the Contact Person no later than Feb 19, 2021. It has been determined that the proposed action is not subject to CP-29. DEC Commissioner Policy 29, Environmental Justice and Permitting (CP-29) No further review in accordance with SHPA is required. The proposed activity is not in an area of identified archaeological sensitivity and no known registered, eligible or inventoried archaeological sites or historic structures were identified or documented for the project location. SEQR Lead Agency: NYS Department of Environmental Conservation State Historic Preservation Act (SHPA) Determination:Ĭultural resource lists and maps have been checked. A coordinated review with other agencies was performed and a Negative Declaration is on file. Project is a Type I action and will not have a significant effect on the environment. State Environmental Quality Review (SEQR) Determination: To ensure timely service at the time of inspection, it is recommended that an appointment be made with the contact person. Availability of Application Documents:įiled application documents, and Department draft permits where applicable, are available for inspection during normal business hours at the address of the contact person. Final reclamation will allow the site to revert back to a forested area. The mine is intended to operate as a traditional bluestone quarry, with no changes to daily operation, with approximately 5,000 tons of material being removed per year. The proposed mine expansion will be located around the existing facility, West of Honey Hollow Rd and East of Philips Road, in the Town of Windsor, Broome County. The applicant, Hepco Quarries Inc., proposes to expand an existing 28.61 acre bluestone mine to 77 acres, within a 166.50 acre parcel of land owned by Hepco Quarries Inc. W Side Honey Hollow Rd - 0.38 Mi S of Anne Rdħ-0350-00113/00001 Permit(s) Applied for:Īrticle 23 Title 27 Mined Land Reclamation
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |